Field Notes

Fieldnotes Limited To:
Site = Twitchell Alfalfa
Year = 2015

2013 | 2014 | 2015 | 2016 | 2017 | 2018
32 Rows returned:
SiteDateAuthorSummary
Twitchell Alfalfa (362) 2015-12-28 13:08:00 Joe Verfaillie Ground squirrels active, two tone field. standard data collection
Twitchell Alfalfa (342) 2015-12-08 14:40:00 Joe Verfaillie Wet and foggy, Fixed chewed diffuse PAR sensor, did soil respiration
Twitchell Alfalfa (329) 2015-11-25 12:19:00 Patty Oikawa Clipped around sensors, swapped IRGA, all looked good
Twitchell Alfalfa (315) 2015-11-11 13:00:00 Joe Verfaillie Swapped main batteries, lots of squirrel activity, troubleshooting diffuse PAR.
Twitchell Alfalfa (302) 2015-10-29 11:30:00 Joe Verfaillie Field still half mowed, no power for spectrometer or LI-6400, squirrels active, low voltage power outages.
Twitchell Alfalfa (288) 2015-10-15 12:30:00 Joe Verfaillie Western half of field mowed, Installed diffuse PAR sensor, spliced SHF 3, Patty did soil respiration
Twitchell Alfalfa (273) 2015-09-30 12:00:00 Sara Knox power issues and problems with the LI-6400, swapped a Forerunner probe, normal data download
Twitchell Alfalfa (259) 2015-09-16 12:00:00 Patty Oikawa Problems getting power to 6400, Forerunner wiring problems continue
Twitchell Alfalfa (245) 2015-09-02 10:00:00 Joe Verfaillie Field half mowed, squirrels causing trouble, full data collection including clip plots.
Twitchell Alfalfa (231) 2015-08-19 13:00:00 Joe Verfaillie Lots of butterflies, fixed wiring on Forerunner probes, swapped 8cm probe.
Twitchell Alfalfa (218) 2015-08-06 10:30:00 Joe Verfaillie Field has been baled - bales just getting picked up, Forerunner wiring might be a problem.
Twitchell Alfalfa (203) 2015-07-22 12:00:00 Patty Oikawa Field cut, spectral comparison, forerunners not doing well, 7500 swap
Twitchell Alfalfa (201) 2015-07-20 09:30:00 Joe Verfaillie Reinstall camera, still not mowed
Twitchell Alfalfa (194) 2015-07-13 11:15:00 Joe Verfaillie Shutdown LGR experiment, removed LGR trailer, camera not working - removed, still not mowed
Twitchell Alfalfa (190) 2015-07-09 09:30:00 Cove Sturtevant Alfalfa way past cutting time. LGR running fine. Miguel soil respiration measurements. Data download.
Twitchell Alfalfa (187) 2015-07-06 09:30:00 Joe Verfaillie Check on the LGR system - all well. Collected data from all instruments, soil chamber measurements
Twitchell Alfalfa (182) 2015-07-01 09:30:00 Joe Verfaillie Check on the LGR system, added line conditioner and UPS, field work, soil respiration, data collection, visitors
Twitchell Alfalfa (180) 2015-06-29 09:00:00 Joe Verfaillie Set up of the LGR trailer with CO2 isotope analyzer, soil chamber measurements.
Twitchell Alfalfa (176) 2015-06-25 09:15:00 Cove Sturtevant Data download. Regular field work. Added theta probes to 12V power supply. Three thermocouples out in the soil CO2 system. Updated autocam to autorestart.
Twitchell Alfalfa (169) 2015-06-18 13:00:00 Joe Verfaillie Field is being irrigated, soil co2 program to saving data - fixed, relay swapped, power converter added.
Twitchell Alfalfa (160) 2015-06-09 09:00:00 Joe Verfaillie Windy, Field half baled, swapped out soil CO2 system, repaired theta cables cut last time, took soil cores, soil respiration, camera did not take photos
Twitchell Alfalfa (148) 2015-05-28 09:15:00 Joe Verfaillie Field half mowed, clipped around ground sensors, clipped a few cables too
Twitchell Alfalfa (141) 2015-05-21 10:00:00 Joe Verfaillie Standard fieldwork, spiced the squirrel holes, updated software on the autocam.
Twitchell Alfalfa (127) 2015-05-07 14:15:00 Cove Sturtevant Data download, standard fieldwork.
Twitchell Alfalfa (113) 2015-04-23 13:00:00 Joe Verfaillie Field has been mown, we clipped around ground sensors, swapped 7500, squirrels are burying the solar panels.
Twitchell Alfalfa (99) 2015-04-09 10:55:00 Cove Sturtevant Regular field work. Data download.
Twitchell Alfalfa (83) 2015-03-24 13:45:00 Cove Sturtevant Sheep grazed tower half of field, leaving ungrazed square. Ants in box - installed bait.
Twitchell Alfalfa (64) 2015-03-05 13:00:00 Cove Sturtevant Sheep in western half of field. Regular field work. Data download. Fixed TC7 in field.
Twitchell Alfalfa (50) 2015-02-19 12:45:00 Patty Oikawa Clip plots, data collection and critter ridder applied around tower. Need more ant bait.
Twitchell Alfalfa (36) 2015-02-05 15:15:00 Joe Verfaillie Standard fieldwork, Alfalfa looks good for February
Twitchell Alfalfa (20) 2015-01-20 14:00:00 Patty Oikawa Moved FD system, normal data collection, soil respiration and spectral measurements
Twitchell Alfalfa (7) 2015-01-07 13:00:00 Sara Knox Swapped 7500. Downloaded data. Ants in soil CO2 box.